Sum the loads, apply converter losses, size the battery and the converter, and check the voltage drop in a cable run.

Preliminary engineering guidance. Results depend on the assumptions listed below and on simplified models. Verify with manufacturer datasheets and a test on your own hardware before committing to a design.

Loads

LoadAverage (W)Peak (W)Duty (0–1)Via DC-DCRemove

Battery and converter

Depth of discharge you will allow.
From the battery datasheet; 0 to skip.

Result

Cable voltage drop (copper, round trip)

Assumptions and limitations

  • Runtime = nominal energy (V × Ah) × usable fraction × (1 − aging derate) ÷ average battery power. Loads behind the converter draw power ÷ efficiency.
  • Not modelled: Peukert effect, temperature, voltage sag under load, converter efficiency varying with load, motor regeneration. Treat the runtime as an upper-bound planning figure and measure it with a discharge test.
  • Average power depends on the duty cycle you enter; the figure is only as good as your duty-cycle estimate. Measure real current with a logging shunt on the prototype.
  • Converter rating = peak output power of the loads it feeds × margin. Check the datasheet for the input voltage range, peak versus continuous current and thermal derating.
  • Cable drop uses copper at 20 °C (1.68×10⁻⁸ Ω·m) for supply plus return conductors. Resistance rises with temperature and with every connector; the figure excludes connector resistance.
  • Default values are placeholders to show the layout, not recommendations.

References

  • Copper resistivity at 20 °C: 1.68×10⁻⁸ Ω·m (standard reference value).