UAV Systems Engineering · Capstone 4 of 4
Complete GNSS-Denied Autonomous UAV
The systems-engineering capstone: not “does the algorithm work” but “can you show, with evidence, that the whole vehicle meets its requirements, including when parts fail.”
This project is graded on engineering judgement as much as on running code. You will specify, design, budget, integrate and verify a GNSS-denied UAV, produce the ten documents that a real programme would require, and defend the trade-offs in them.
Mission and scope
Design a UAV for inspection of an industrial site with indoor and outdoor segments: it must fly a 10-minute mission, navigate where GNSS is unavailable or untrusted, map its surroundings, avoid obstacles, respond safely to the failure of any single navigation sensor, and finish with a controlled landing. The vehicle carries a stereo camera, an IMU, a 3D LiDAR, a GNSS receiver, an NVIDIA Jetson-class companion computer, and a PX4 flight controller.
Fix the mission, environment, payload and operational limits in the first document and treat them as requirements. You are encouraged to adapt the scenario (tunnel, warehouse, forest) but must state what changes.
What you will implement
- Requirements and architecture: derive verifiable requirements and decompose them (lessons M8-T1, M8-T2).
- Sensor selection with a trade study, calibration plan and timing design (lessons M7-T8 to M7-T16).
- Sensor fusion and state estimation with VIO, LIO and GNSS, honest covariance and consistency monitoring (modules 3 and 4).
- Localisation, mapping and obstacle perception sufficient for the mission (module 4).
- Motion planning and flight control: trajectory generation and tracking with PX4 offboard control (modules 5 and 6).
- Fault detection and degraded navigation: confidence levels, modes and failsafes with timers derived from drift (lessons M2-T16, M8-T9 to M8-T14).
- System verification: simulation, hardware-in-the-loop where available, ground tests and a flight-test acceptance plan (lessons M8-T3 to M8-T6).
System architecture
The reference architecture above is a starting point. Whatever you build, your architecture document must show: every interface with its message type, rate, frame and owner (the ICD); which computer runs each function and its compute and power share; what happens when each sensor, the companion computer, or the link fails; and where timing and synchronisation are established.
| Layer | Minimum content | Where to look |
|---|---|---|
| Sensors | Models or classes, mounting, field of view, rates, power | M1-T8, M1-T10, M7-T12 to M7-T14 |
| Perception and odometry | VIO and LIO, health indicators, covariance | M2-T10 to M2-T14, M4-T4, M4-T8 |
| Estimation | Fusion estimator, gating, consistency | M3-T4 to M3-T16 |
| Planning and control | Trajectory, tracker, constraints | M5-T8 to M5-T15 |
| Flight software | PX4, EKF2 external odometry, offboard | M6-T5, M6-T10, M6-T11 |
| Safety | FMEA, FDIR, degraded modes, failsafes | M8-T7 to M8-T14 |
Requirements
| ID | Requirement | Verification method |
|---|---|---|
| SYS-01 | The vehicle shall complete a 10-minute mission over a 300 m route with GNSS unavailable for the middle 60% of the route. | Flight test or simulation of the full route (VT-01) |
| SYS-02 | Horizontal position error at the end of the GNSS-denied segment shall not exceed 1.0 m (95th percentile over runs). | Test with ground truth; evo analysis (VT-02) |
| SYS-03 | The vehicle shall maintain at least 1.0 m clearance from obstacles larger than 0.2 m at speeds up to 2 m/s. | Simulation and ground test with obstacles (VT-03) |
| SYS-04 | Loss of any single navigation sensor (GNSS, camera, LiDAR) shall not cause loss of control; the vehicle shall continue in a defined degraded mode. | Fault-injection in simulation and ground/flight test (VT-04) |
| SYS-05 | GNSS spoofing with a position ramp of at least 1 m/s shall be detected within 10 s and GNSS excluded. | Replay-injection test (VT-05) |
| SYS-06 | On loss of all odometry aiding, the vehicle shall execute a controlled stop within seconds, derived from the drift rate and the clearance (lesson M8-T11). | Test and analysis (VT-06) |
| SYS-07 | End-to-end latency from sensor exposure to setpoint shall not exceed 100 ms (p99). | Timing measurement (VT-07) |
| SYS-08 | Companion computer power, thermal and compute shall stay within the budget at maximum ambient temperature. | Bench test under load (VT-08) |
| SYS-09 | Loss of the GCS link for 5 s shall trigger the configured link-loss action. | Ground and flight test (VT-09) |
| SYS-10 | The estimator shall be statistically consistent: mean NIS within the 95% interval for each fused source in nominal conditions. | Log analysis (VT-10) |
The ten deliverables: what each must contain
| # | Deliverable | Must contain | Evidence of quality |
|---|---|---|---|
| 1 | System requirements document | Mission, environment, operating limits, numbered verifiable requirements with rationale; assumptions; out-of-scope items | Every requirement is testable and has a verification method; derived requirements trace to parents |
| 2 | System architecture diagram | Blocks, interfaces, frames, rates, compute allocation, power domains, failure containment | A reviewer can find, for every failure mode, where it is detected and handled |
| 3 | Sensor selection and trade study | Candidate sensors, criteria with weights, vendor-published specifications with sources, sensitivity analysis of the ranking | Specifications are cited, not invented; choice survives changing the weights |
| 4 | Interface Control Document | For each interface: producer, consumer, message type, rate, frame, units, timing (stamp semantics), latency budget, failure behaviour, version | Two engineers could implement both sides independently from the ICD alone |
| 5 | Sensor calibration plan | Intrinsics, camera-IMU and LiDAR-IMU extrinsics, time offsets, IMU noise (Allan), procedures, tolerances, frequency and re-calibration triggers | Each parameter has an acceptance tolerance and a check that can be run in the field |
| 6 | Timing and synchronisation plan | Clock sources, trigger scheme, timestamp semantics, PTP/PPS usage, jitter budget, monitoring of offsets | Measured offsets and jitter against the budget |
| 7 | Compute, power and thermal budget | Per-function CPU/GPU/memory use, power per mode, thermal limits at ambient maximum, margins | Measurements on the target computer under the full pipeline |
| 8 | FMEA | Navigation, compute, power, link, actuators; severity-first prioritisation; detection and mitigation per mode | Every severity ≥ 9 mode has a verified mitigation (lesson M8-T7) |
| 9 | Integration test plan | Test levels (unit, SIL, HIL, ground, flight), test cases per requirement, pass/fail criteria, environment, tools | Requirements-to-tests traceability matrix with no gaps |
| 10 | Flight-test acceptance report | Test conditions, results against each requirement, deviations, anomalies, residual risks, operating limitations | States what was not verified and the resulting limits on operation |
Interface Control Document: starter table
Extend this table for every interface in your architecture. The fields shown are the minimum.
| ID | From → to | Message / medium | Rate | Frame · units | Timestamp semantics | Latency budget | On failure |
|---|---|---|---|---|---|---|---|
| IF-01 | IMU → fusion | sensor_msgs/Imu | IMU-dependent (set from datasheet) | FLU · rad/s, | Acquisition time on the shared clock | To be budgeted | Estimator coasts; health flag |
| IF-02 | Camera → VIO | sensor_msgs/Image + CameraInfo | From camera mode | Optical frame · pixels | Exposure start or trigger time | To be budgeted | VIO reports lost; monitor lowers confidence |
| IF-03 | LiDAR → LIO | sensor_msgs/PointCloud2 with per-point time | From LiDAR mode | LiDAR frame · | Per-point time relative to scan start | To be budgeted | LIO reports lost |
| IF-04 | Fusion → PX4 EKF2 | px4_msgs/VehicleOdometry on /fmu/in/vehicle_visual_odometry | Fixed by design | NED/FRD · , m/s | timestamp_sample = acquisition time | To be budgeted | EKF2 falls back per its parameters |
| IF-05 | Planner → PX4 | OffboardControlMode + TrajectorySetpoint | Fixed, above PX4’s minimum | NED · , m/s | Publication time | To be budgeted | PX4 leaves offboard mode |
| IF-06 | Fusion → supervisor | Navigation state + health record (custom) | Estimator rate | Any · documented | Estimator time | To be budgeted | Supervisor assumes RED |
Verification strategy
- Unit and component tests: frame conversions, monitors, state machines (as in the lessons’ runnable examples).
- Software-in-the-loop: the full stack with PX4 SITL and a simulated environment; every failure of the FMEA injected at least once (lesson M8-T4); use the GNSS-Denied Failure Simulator to design the scenarios first.
- Hardware-in-the-loop and bench: the real companion computer and flight controller with replayed or simulated sensors; timing, power and thermal budgets measured here.
- Ground tests: props off, then tethered: sensor health, calibrations, failsafe triggers, link-loss behaviour.
- Flight tests: staged from benign to demanding, each with entry criteria, a safety pilot, abort criteria and a written result (lesson M8-T5). Where flight is not possible for you, perform the equivalent in simulation and say so in the acceptance report.
Every requirement in the table above must appear in the traceability matrix with at least one test and the result of that test.
Suggested schedule
| Phase | Content | Output |
|---|---|---|
| 1 | Mission, requirements, architecture, FMEA first pass | Documents 1, 2, 8 (draft) |
| 2 | Sensor trade study, calibration and timing design | Documents 3, 5, 6 |
| 3 | Estimator and perception in simulation or on datasets | Evaluation reports |
| 4 | Planner, controller and PX4 integration, ICD | Document 4, closed-loop SIL runs |
| 5 | Budgets measured, failure injection, degraded modes | Document 7, FMEA update |
| 6 | Integration test plan executed; acceptance report | Documents 9 and 10 |
Deliverables
- 1. System requirements document.
- 2. System architecture diagram.
- 3. Sensor selection and trade study.
- 4. Interface Control Document.
- 5. Sensor calibration plan.
- 6. Timing and synchronisation plan.
- 7. Compute, power and thermal budget.
- 8. Failure Mode and Effects Analysis.
- 9. Integration test plan.
- 10. Flight-test acceptance report.
Acceptance criteria and grading rubric
| Criterion | Acceptable | Strong |
|---|---|---|
| Requirements | Numbered, verifiable, with verification methods | Derived requirements traced to parents; rationale for each limit |
| Architecture and ICD | Complete interfaces with rate, frame and failure behaviour | Implementable independently from the ICD; latency budget closed |
| Trade study | Cited sensor specifications and a weighted comparison | Sensitivity analysis; rejected options explained |
| Calibration and timing | Plans with tolerances | Measured offsets and residual error budgets |
| Budgets | Compute, power, thermal numbers from measurements | Margins at worst-case ambient with worst-case mode |
| FMEA and FDIR | Severity-first, each high-risk mode mitigated | Mitigations verified by fault injection with detection times |
| Verification | Traceability matrix without gaps | Results with statistics over repeated runs and honest limitations |
| Acceptance report | Requirement-by-requirement result | Operational limitations derived from what was not verified |
Common failure points
- Choosing sensors from marketing numbers; cite vendor documentation and state test conditions.
- Writing requirements that cannot be verified (“robust”, “reliable”) instead of measurable limits.
- An architecture diagram that omits power, time and failure paths.
- Budgets from datasheet peaks instead of measured load of the full pipeline.
- An FMEA written once at the end instead of driving the design.
- Claiming success from the nominal case; the failure cases are the capstone.
- Reporting only means: report percentiles and worst cases (lesson M7-T6).
References
- NASA Systems Engineering Handbook (requirements, verification and validation, risk)
- SAE ARP4754A: Guidelines for development of civil aircraft and systems
- EASA: specific category civil drones (operational risk assessment, SORA)
- PX4 Autopilot User Guide
- W. Xu et al., FAST-LIO2, IEEE T-RO, 2022
- T. Qin et al., a general optimization-based framework for local odometry estimation with multiple sensors, arXiv:1901.03638