Engineering Guides · Module 19
Pre-power-on hardware inspection
Most hardware damage happens in the first minute. Measure before you power on, with limits written down.
Assumptions: Numbers in the examples are illustrative and the code is executed by the site’s tests. Facts taken from a cited source are marked; other statements are general engineering knowledge and must be confirmed on the datasheet of the part you use.
1. Engineering problem
A wiring error, reversed pack or shorted rail does its damage as soon as power is applied. A short list of measurements with limits takes minutes and prevents the most expensive mistakes.
2. When is this needed?
- First power-up of a new or rebuilt robot.
- After any wiring, battery or motor change.
- Before every field deployment, as a short version.
3. Selection and design decisions
Checks (the limits come from your design and the datasheets; the ones shown are illustrative): pack voltage within the range of every consumer (for a 7S NMC pack, 21.0 to 29.4 V from the per-cell range of 3.0 to 4.2 V, Battery University BU-205); resistance between supply rails with power off, to find shorts; insulation between the chassis and the supply; fuse rating against worst-case current; free rotation of wheels and joints; and that the emergency stop removes drive power.
| Check | How | Fail means |
|---|---|---|
| Pack voltage | Meter at the pack and at the main fuse | Wrong chemistry, cell count or a deeply discharged pack |
| Rail resistance, power off | Ohmmeter between supply rails | A short or a large uncharged capacitor load |
| Chassis insulation | Ohmmeter or insulation tester | A conductor touching the frame |
| Fuse margin | Compare ratings with the worst-case current | Fuse blows on start or fails to protect the wire |
| Mechanical freedom | Turn wheels and joints by hand | Binding that will overload a motor |
| Emergency stop | Press with the drive enabled and no motion command | The stop does not cut drive power |
4. Advantages and disadvantages
- More checks catch more faults and cost time: keep a short daily version and a full version after changes.
- Powering through a current-limited supply first limits the damage of a fault.
- A written checklist beats memory.
5. Requirements and constraints
- Limits written in the checklist, not decided on the spot.
- Two people for the first power-up of a new design.
- A current-limited bench supply for the first power-up where possible.
6. Architecture
checklist ─▶ measure (power off) ─▶ all pass? ─▶ current-limited power-up ─▶ full power ─▶ functional checks7. Implementation
- Print the checklist with limits.
- Measure with power off (below).
- Fix any failure and repeat the measurement.
- Power up through a current-limited supply and watch the current.
- Move to the full battery and run the functional checks.
checks = [
("pack voltage (7S NMC, 3.0-4.2 V per cell => 21.0-29.4 V)", 25.8, 21.0, 29.4, "V"),
("resistance between supply rails, power off", 0.4, 5.0, None, "ohm"),
("resistance chassis to supply minus, power off", 2.0e6, 1.0e5, None, "ohm"),
("main fuse rating minus worst-case current", 15.0 - 9.0, 1.0, None, "A"),
("wheel free rotation torque (should be small)", 0.05, None, 0.2, "N m"),
("emergency stop removes drive power (1 = yes)", 1, 1, 1, ""),
]
failed = 0
for name, v, lo, hi, unit in checks:
ok = (lo is None or v >= lo) and (hi is None or v <= hi)
failed += not ok
print(("PASS" if ok else "FAIL"), f"{name}: {v} {unit}")
print("do not power on" if failed else "all inspections passed", f"({failed} failed)")Printed (checked by the site’s tests):
PASS pack voltage (7S NMC, 3.0-4.2 V per cell => 21.0-29.4 V): 25.8 V
FAIL resistance between supply rails, power off: 0.4 ohm
PASS resistance chassis to supply minus, power off: 2000000.0 ohm
PASS main fuse rating minus worst-case current: 6.0 A
PASS wheel free rotation torque (should be small): 0.05 N m
PASS emergency stop removes drive power (1 = yes): 1
do not power on (1 failed)Reading it: the pack voltage of 25.8 V is within the 7S NMC range, the chassis is well insulated, the fuse has 6 A of margin, the wheels turn freely and the emergency stop works; but 0.4 Ω between the supply rails is below the (illustrative) 5 Ω limit, so the checker says not to power on. All limits are illustrative: take yours from the design.
8. Real examples
- New AMR build: the rail-resistance check found a pinched wire before the first power-up.
9. Failure scenarios
- Powering on with the battery connected backwards.
- Skipping the check after a quick repair.
- A fuse that is larger than the wire rating.
10. Troubleshooting
- If a rail reads low, find the short by isolating sections.
- If insulation is low, look for a conductor against the chassis.
- If the emergency stop does not cut power, do not operate.
11. Validation
- The checker prints the lines shown (executed by the site tests).
- Every robot passes the checklist before each deployment, and the results are recorded.
12. Engineering checklist
13. Further references
- Battery University BU-205 (cell voltage ranges): batteryuniversity.com, read 2026-11-05. The other limits are design values and not drawn from a cited source.