Module 19 · Phase 5: Deployment engineering

Testing, Validation & Field Deployment

Commission and field-test a robot: pre-power checks, sensor and calibration validation, bag recording, reproducing intermittent failures, regression tests, deployment and rollback.

Intermediate 6 guides 2 diagnostics 0 tools

This overview is open. 6 of 6 guides are written; the others show Coming soon until they are complete and tested.

Questions this module answers

  • What should I check before powering on a robot, and how do I prepare a field test?
  • What should I record in a ROS bag?
  • How do I reproduce an intermittent failure and validate SLAM accuracy?
  • How do I prepare for production deployment?

What it covers

  • Hardware, sensor and calibration validation
  • Integration, software and HIL testing
  • SLAM evaluation, navigation success rate, latency
  • Field testing, bag recording, regression
  • Deployment, rollback, maintenance

Guides and design decisions

Diagnostics, tools and challenges

C. Troubleshooting (2)

E. Design challenges (2)

Practical deliverables

Read first: existing FixTheRobot lessons and labs

This module builds on these instead of repeating them.